MDP provided mechanical, electrical, and plumbing design services for the boiler plant replacement at Denver’s historic Oxford Hotel, providing a tankless type water heater solution in place of the existing gas fired boilers.  The scope included challenges in maintaining the hotel operational while the retrofit occurred, requiring significant coordination in design and construction sequencing minimizing plant downtime.  The retrofit not only provided an energy efficient solution reducing the utility premium for the hotel, but increased the redundancy for the system to prevent any loss of service in the future.

MDP Engineering Group has achieved remarkable milestones

Our commitment to excellence and innovation has earned us numerous industry awards and a reputation for delivering top-notch engineering solutions. Join us as we continue to build a legacy of success and reliability in the engineering industry.

10
Licensed Professional Engineers (P.E.)
40+
Local Team Members
20+
State Licenses
100+
LEED Certified Projects
Marriott Full Service HotelMarriott Full Service Hotel

Marriott Full Service Hotel

Electrical
Mechanical
Plumbing
LEED Design
Marriott AC RinoMarriott AC Rino

Marriott AC Rino

Mechanical
Electrical
Plumbing
LEED Design
Hilton Garden InnHilton Garden Inn

Hilton Garden Inn

Electrical
Mechanical
Plumbing