MDP provided mechanical and plumbing design services for the new seven-story Marriott AC Hotel in Denver’s vibrant RiNo neighborhood. The 128-key, light gage, steel-framed structure features a first-floor lobby, kitchen, and back-of-house spaces; a second-floor fitness center; and upper floors with stacked, typical unit layouts.

The HVAC design included roof-mounted air-source heat pump units ducted to corridors, guest rooms, and fan coil units (FCUs), with rooms served by low-profile horizontal FCUs connected air-source heat pump units. Plumbing design supported the hotel’s lounge, dining, kitchen, laundry, and other brand-standard amenities. MDP collaborated closely with the design-build team, ensuring systems met Marriott Brand Standards and complied with Denver’s energy codes, and designed with provisions for LEED mechanical and plumbing credits if pursued.

MDP Engineering Group has achieved remarkable milestones

Our commitment to excellence and innovation has earned us numerous industry awards and a reputation for delivering top-notch engineering solutions. Join us as we continue to build a legacy of success and reliability in the engineering industry.

10
Licensed Professional Engineers (P.E.)
40+
Local Team Members
20+
State Licenses
100+
LEED Certified Projects
Union Tower WestUnion Tower West

Union Tower West

Mechanical
Electrical
Plumbing
Il PostoIl Posto

Il Posto

Electrical
Mechanical
Marriott AC Hotel BellevueMarriott AC Hotel Bellevue

Marriott AC Hotel Bellevue

Mechanical
Electrical
Plumbing
Magnolia HotelMagnolia Hotel

Magnolia Hotel

Mechanical
Electrical
Plumbing